LB # 16 USING THE PROJECT-BASED LEARNING MULTIMEDIA AS A TEACHING -LEARNING STRATEGY

  • What are the steps involved in the use of project-based multimedia learning strategy?
                   The effective use of project-based multimedia learning requires through planning. Initiak planning involves:
  1. clarifying goals and objectives
  2. determining how much time is needed and extend of students' involvement in decision making
  3. setting up forms of collaboration
  4. identifying and determining what resources are needed
  5. deciding on the mode to measure what students learn.
       THE VARIOUS PHASES OF THE PROJECT INCLUDE:
  1. before the project starts
  2. introduction of the project
  3. learning the technology
  4. preliminary research and planning
  5. concept design and storyboarding
  6. first draft production
  7. assessing, testing and finalizing presentations
  8. concluding activities